Set the study date
The default intervals are days 1, 2, 4, 7 and 15 after study; edit them freely.
Create editable review dates from a study day, then copy or export the calendar.
Open Spaced Review Calendar →The default intervals are days 1, 2, 4, 7 and 15 after study; edit them freely.
Inspect each date, copy the list or download a calendar file.
Use Manlin to reflect, plan and take your next step.

No. This is a starting template; adjust it for difficulty and feedback.